Hi Richard,
Is there any issue on your position if I would propose below method? = If there is any issues on your position, I would propose below methods: (Install cable from existing JB to new light instead of new JB) = Install the existing JB to the new light instead of new JB.
Following project BOD, each luminary shall have a JB installed adjacent to each light and JB shall have sufficient TBs to install an additional cable supplying future luminaries. = Following project BOD, each luminary shall have adjacent JB installed to each light and the JB shall have sufficient TBs to install an additional cable supplying future luminaries.
I believe that this kind of late = evening lights can be considered as future luminaries and I couldn’t expect more lights to be installed at future. = in the future.
In addition, DSME can supply enough 2x2.5 mm2 +E project cable and it is equivalent with= to SBM design criteria.
If we use additional new JBs, we need 2x4mm2+E, but I am not sure if DSME has enough spare.
Blue color = wrong
Red color = correct |